Difference between revisions of "Meeting Minutes 20100907"

From i3Detroit
Jump to: navigation, search
(Created page with 'Category:MeetingMinutes Heating * landlord owes the space 1 or 2 furnaces before winter. * more info when Russ is back in town DIY Street Fair * i3Detroit wi...')
 
 
(2 intermediate revisions by one user not shown)
Line 1: Line 1:
[[Category:MeetingMinutes]]
 
 
 
Heating
 
Heating
  
Line 75: Line 73:
 
Shower
 
Shower
  
     * rim was sealed, leak is now very slow.  ok to use. BYO Towel.
+
     * rim was sealed, leak is now very slow.  ok to use. BYO Towel. Ted will continue to try to completely fix the leak.
  
  
Line 85: Line 83:
 
Kitchen
 
Kitchen
  
     * stroves, fridge, etc coming from whirlpool.  a shop stove will be setup for non-food things like powder coating
+
     * stove, fridge, etc coming from whirlpool.  a shop stove will be setup for non-food things like powder coating
  
  
Line 93: Line 91:
  
 
Welding shield improvements - a full wrap around shield is needed for arch welding. ASAP. Ted and Nick said they'll get on it.
 
Welding shield improvements - a full wrap around shield is needed for arch welding. ASAP. Ted and Nick said they'll get on it.
 +
 +
[[Category:Organization Information]][[Category:Meeting Minutes]]

Latest revision as of 15:46, 24 June 2012

Heating

   * landlord owes the space 1 or 2 furnaces before winter.
   * more info when Russ is back in town


DIY Street Fair

   * i3Detroit will be running a kids craft make and take Sat and Sun for 500 approximately kids,
   * Voluteers needed
   * Talk to Nic if you want to help.


Logo

   * discuss on mailing list. 
   * a working group is to be formed


Member Roster

   * pictures, bios, etc..
   * voluntary.
   * members only.
   * physically at the space
   * question or comments contact Ross.


Winterize the space

   * list of things to be done before and after winter.
   * high priority before winter list


Candidate Spiels

   * Eric, Brad, Dennay, Paul K., Trevor, Ed, Joe, Aaron, and Ross
   * Nate B was not in attendance.
   * Vote is to be opened so that it will end at 9/21/2010 9pm at the meeting.


Auto Work

   * fire extinguishers are needed, etc
   * punch list needs to be done before we go to the city asking favors.


Evil Dead

   * Ted is heading it up.  needs help builing props. its thankless but FUN.


Electronics Store

   * Ted has some parts enroute. ask ted for parts you want.


Twitterbot

   * needs fixing. see ted after the meeting.


NYC Maker Faire - will have no twinkie car...


Punchlist:

Signage

   * may need a “professionally” made sign.


Shower

   * rim was sealed, leak is now very slow.  ok to use. BYO Towel. Ted will continue to try to completely fix the leak.


Graveyard Clean out

   * things are going back into it.  if you want your stuff get it out of the grave yard.


Kitchen

   * stove, fridge, etc coming from whirlpool.  a shop stove will be setup for non-food things like powder coating


Marking Out Walkways (no stuff can be left in walkways) - start with chalk or duct tape then paint permanent lines.

Storage of flammables - fire cabinet needed and rules need to be checked.

Welding shield improvements - a full wrap around shield is needed for arch welding. ASAP. Ted and Nick said they'll get on it.