Bored? Got an urge to do stuff for the space? Pick a task from this list, and advance it. Ask for help if you need it.  
+
Welcome to the Potlock to do list, please pick a task and put your name in the column.  
  
 
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store.
 
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store.
Line 11: Line 11:
 
! Approx Cost of materials
 
! Approx Cost of materials
 
|-
 
|-
| Fix OFF switch on Grizzly (wood) band saw.
+
| Add new magnetic switch to grizzly bandsaw
| <strike></strike>
+
 
|  
 
|  
 +
| Nick B?
 
|  
 
|  
 
|-
 
|-
| <strike>Replace light fixture just inside the main door</strike>
+
|Move tool crib cord reel to own circuit
| <strike>Nate W got the fixtures. Now need to be installed</strike>
+
|
| Nate W
+
|Dave S?
| $22
+
|
 
|-
 
|-
| <strike>Buy more T-8 bulbs </strike>
+
|remove old as furnace by front door
| 10+ pack, We use T-8 4100k Could always use more.
+
|
| Nate W
+
|
| $20-25
+
|
 
|-
 
|-
| Move tool crib drop cord reel from light-switch circuit to another circuit
+
|Move switches for all commons lights near front door
| ask Dave S about an (apparently) unused circuit in the SE shop ceiling conduits
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Replace ceiling fan by parts area, rehang commons fan, de-kludge fan wiring
+
|make vinyl "propaganda signs"
| note: new fan is up and running, other tasks remain
+
|sayings about keeping the place clean and such
| Dave S
+
|
|  
+
|
 
|-
 
|-
| Uninstall old ass furnace in large door bay.
+
|Redo drip pan above server rack, and install tube to sink for drainage
| Unit is inefficient, and useless!
+
|
| Genie + Forklift
+
|
| $0 ?
+
|
 
|-
 
|-
| Move light switches near door
+
|Put up more shelving in power wheels area
| Install switches by main entrance to control all overhead lights.<br> - Leave machine shop separate, reroute switch within machine shop.
+
|
|  
+
|
| &nbsp;??
+
|
 
|-
 
|-
| <strike>Clean crud out of washtub! </strike>
+
|intall seals around garage door
| <strike>EWWWW&nbsp;:( </strike>
+
|
| You are my hero!
+
|
|  
+
|
 
|-
 
|-
| Vinyl propaganda signs
+
|Seal off end of member storage to help deflect dust
| Come up with sayings "Sweep around machines, do I look like your mom?"
+
|
| Nate W/Vinyl Team
+
|
| $0
+
|
 
|-
 
|-
| Redo drip pan above server rack before it turns into a waterfall.
+
|mount second motor onto dust collector and wire it up
| Install drain tube down to washtub
+
|
|  
+
|
| $10-20?
+
|
 
|-
 
|-
| Install shelving in Power wheels area, re-purpose benches.
+
|mount dust collector switches
| Find more 12-14' pallet racking
+
|
| nate w / rocco / anyone!
+
|
| &nbsp;???
+
|
 
|-
 
|-
| Garage-door floor
+
|make storage area for shop vac accessories
| Raise concrete level below door higher than outside. <br> Home depot has thick rubber seals that would help too. $10ish
+
|
| Nate W
+
|
| $4-14
+
|
 
|-
 
|-
| Redo shop restroom
+
|sweep and vaccum
| Remount &amp; Paint stalls, Title floor, Cover walls.
+
|
|  
+
|
| $$$? - a lot
+
|
 
|-
 
|-
| seal off end of member storage shelves in woodshop so that equipment can be butted against it.
+
|get audio system up and running
| Screw panels to ends of shelves, and between to create full wall.
+
|
|  
+
|
| $48
+
|
 
|-
 
|-
| Mount and wire motor to dust collector
+
|mount and wire security cameras
|  
+
|
| Ted and Nate B <br> are looking into this.
+
|
|  
+
|
 
|-
 
|-
| Mount dust collector relays
+
|clean up and organize fastener area
| 1 on dust collector, 2nd near table saw.
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| &nbsp;
+
|build a bench for the two sandblaster to live on
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
| '''PRIOR TASKS THAT STILL NEED DONE!!'''
+
|make a cart to hold the folding chairs
|  
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Update MSDS binder by door
+
|pull down old dust collector in metal shop and assess
|  
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| <strike>Affix laser-cutter inner lights with Dual-Lock strips </strike>
+
|mount sorenson PSU under e-lab shelf
| Get high off 3m adhesive primer
+
|
| Anyone? See Nate B
+
|
| $0
+
|
 
|-
 
|-
| Construct shop-vac accessories rack
+
|make a bin for cargo straps and bungees
| Gather all nozzles and design rack
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Clear Genie-width path to member storage
+
|install automatic drain on air compressor
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| remove MDF table/counters from wood shop
+
|move the milo speakers to the loft
| ask Nick to take home/remove
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Mount monitor on/near rack, for admin KVM usage
+
|build another clamp rack identical to first one
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Consolidate adhesives/solvents/cleaners/etc and label <br>each&nbsp;location&nbsp;with pointers to the other
+
|organize forms area by front door, run off plenty of copies
|  
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| Cover roof openings, consider snow-melt drainage in your design
+
|install filter on large sandblaster
| Adjust rear shop cover, cover is not air tight and has shifted with a draft.
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| Winterization stuff (Bill putt suggested -- need more specifics)
+
|make sure all fire extinguishers are properly hung
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| add dividers to member storage shelves
+
| separate lights and equipment circuits in metal shop
| use tape or paint to divide the shelves into quarters
+
|
|  
+
|
|  
+
|
 
|-
 
|-
| clean up FIRST area
+
|add floor sweep to dust collector
| throw away junk and put all gear into bins below benches
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| sweep and vacuum your butt off
+
|organize above window lumber storage areas
|  
+
|
| everyone!
+
|
| $0
+
|
 
|-
 
|-
| identify emergency exit routes and paint the lines
+
|dispose of big red dust collector pipe
| we have floor marking paint, (update:picked up skinny rollers)
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| finish up audio system
+
|add cleanout dates to member storage
| mount amplifiers in rack, mount speakers, run wire
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| mount and wire security cameras
+
|add longer cord to jointer
| talk to Joe B or Nate B about camera mount locations
+
|
|  
+
|
| &nbsp;?
+
|
 
|-
 
|-
| Make boxes to store assorted tools in tool area
+
|organize scrap lumber under chop saw
| identify tools which need boxes
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| remove desk from whiteboard room
+
|build rack for small lumber storage
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| organize fastener area
+
|re-wire treehouse lights to one switch
| organize and label fasteners
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| build table for little sanblaster
+
|dispose of old fluorescent lights
| talk to dustin about getting the sandblaster set up
+
|
|  
+
|
| $9
+
|
 
|-
 
|-
| <strike>Reroute all e-room bench equipment power cords to go behind shelf<br> (empty shelf, rip half an inch off its depth, remount it, reload it) </strike>
+
|hang i3 sign at front door, peel off ebay part from back
|  
+
|
| <strike>Nate B</strike>
+
|
| $0
+
|
 
|-
 
|-
| <strike>Label all E-room gear power cords (Many already done, follow example) </strike>
+
|pack up chem lab glassware and equipment into boxes
|  
+
|Nick takes home
| <strike>Nate B</strike>
+
|
| $0
+
|
 
|-
 
|-
| Document 115V circuits
+
|clear out hallway in office
| Documentation: [[Breaker Panels]]
+
|fire marshall does not like
| Dave S
+
|
|  
+
|
 
|-
 
|-
| allocate two of the steel drums for aluminum and steel scrap
+
|finish carpet tiles in e room
| put vinyl signage on drums
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| store unused dust collector manifold and filters in loft
+
|set up phone that is in kitchen
| put filters in garbage bags
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| <strike>move 5sl printer away from print shop over to server area.</strike>
+
|break down and dispose of black table near graveyard
|  
+
|
| <strike>Rocco</strike>
+
|
| $0
+
|
 
|-
 
|-
| organize vinyl cutter area.
+
|have Russ take home hitachi tablesaw
|  
+
|
|  
+
|
 +
|
 
|-
 
|-
| level rough concrete
+
|organize black metro rack by door
|  
+
|
|  
+
|
| $8
+
|
 
|-
 
|-
| make signage to identify circuit breakers
+
|hang up giant picture of war machine from iron man
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| make a cart for folding chairs
+
|either re-hang or dispose of conduit chandelier
|  
+
|
|  
+
|
| &nbsp;???
+
|
 
|-
 
|-
| replace vents in office area  
+
|install pullchain on light fixture above welding area
|  
+
|
|  
+
|
| &nbsp;???
+
|
 
|-
 
|-
| install cisco network gear into rack
+
|install second 220 plug on other side of box for kiln
| rocco will be bringing in a rack for this purpose
+
|
| rocco
+
|
| $0
+
|
 
|-
 
|-
| clean up kitchen and throw out old stock of goods
+
|get rid of parabolic dish
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| install small shelf to place microwave in cabinet
+
|break down half moon desk and send it to dumpster town.
| talk to dustin for direction
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| talk to Bob B about painting fridge (brown one)
+
|add second cord reel above commons tables
|  
+
|
|  
+
|
| $0
+
|
 
|-
 
|-
| make soda can dispensers for white refrigerator
 
| talk to dustin for direction
 
|
 
| &nbsp;???
 
|-
 
| pull down drum from metal dust collector in metal shop
 
| assess if machine is in functioning order
 
|
 
|
 
|-
 
| Mount Sorensen PSU under e-lab shelf
 
|
 
| Nate or Joe
 
|
 
|}
 

Revision as of 15:46, 4 March 2012

Welcome to the Potlock to do list, please pick a task and put your name in the column.

Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.


Task Next Action Volunteer? Approx Cost of materials
Add new magnetic switch to grizzly bandsaw Nick B?
Move tool crib cord reel to own circuit Dave S?
remove old as furnace by front door
Move switches for all commons lights near front door
make vinyl "propaganda signs" sayings about keeping the place clean and such
Redo drip pan above server rack, and install tube to sink for drainage
Put up more shelving in power wheels area
intall seals around garage door
Seal off end of member storage to help deflect dust
mount second motor onto dust collector and wire it up
mount dust collector switches
make storage area for shop vac accessories
sweep and vaccum
get audio system up and running
mount and wire security cameras
clean up and organize fastener area
build a bench for the two sandblaster to live on
make a cart to hold the folding chairs
pull down old dust collector in metal shop and assess
mount sorenson PSU under e-lab shelf
make a bin for cargo straps and bungees
install automatic drain on air compressor
move the milo speakers to the loft
build another clamp rack identical to first one
organize forms area by front door, run off plenty of copies
install filter on large sandblaster
make sure all fire extinguishers are properly hung
separate lights and equipment circuits in metal shop
add floor sweep to dust collector
organize above window lumber storage areas
dispose of big red dust collector pipe
add cleanout dates to member storage
add longer cord to jointer
organize scrap lumber under chop saw
build rack for small lumber storage
re-wire treehouse lights to one switch
dispose of old fluorescent lights
hang i3 sign at front door, peel off ebay part from back
pack up chem lab glassware and equipment into boxes Nick takes home
clear out hallway in office fire marshall does not like
finish carpet tiles in e room
set up phone that is in kitchen
break down and dispose of black table near graveyard
have Russ take home hitachi tablesaw
organize black metro rack by door
hang up giant picture of war machine from iron man
either re-hang or dispose of conduit chandelier
install pullchain on light fixture above welding area
install second 220 plug on other side of box for kiln
get rid of parabolic dish
break down half moon desk and send it to dumpster town.
add second cord reel above commons tables