ToDo
(Difference between revisions)
Dustinbikes (Talk | contribs) |
(new tasks) |
||
| Line 10: | Line 10: | ||
! Volunteer? | ! Volunteer? | ||
! Approx Cost of materials | ! Approx Cost of materials | ||
| + | |- | ||
| + | |Empty the chem lab to make way for the fablab | ||
| + | |Shovel? | ||
| + | |Nick B | ||
| + | |just time | ||
| + | |- | ||
| + | |Build another cable-reel rack just like the first one. | ||
| + | | | ||
| + | | | ||
| + | |$0 | ||
| + | |- | ||
| + | |Hook up the little laser cutter | ||
| + | |Find countertop space in the fab-lab | ||
| + | | | ||
| + | | | ||
|- | |- | ||
|Move tool crib cord reel to own circuit | |Move tool crib cord reel to own circuit | ||
Revision as of 09:25, 30 May 2012
Welcome to the Potlock to do list, please pick a task and put your name in the column.
Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.
| Task | Next Action | Volunteer? | Approx Cost of materials | |
|---|---|---|---|---|
| Empty the chem lab to make way for the fablab | Shovel? | Nick B | just time | |
| Build another cable-reel rack just like the first one. | $0 | |||
| Hook up the little laser cutter | Find countertop space in the fab-lab | |||
| Move tool crib cord reel to own circuit | Dave S | |||
| remove old as furnace by front door | ||||
| Move switches for all commons lights near front door | ||||
| make vinyl "propaganda signs" | sayings about keeping the place clean and such | |||
| Put up more shelving in power wheels area | ||||
| install seals around garage door | ||||
| Seal off end of member storage to help deflect dust | ||||
| mount dust collector switches | ||||
| sweep and vaccum | ||||
| get audio system up and running | ||||
| mount and wire security cameras | ||||
| mount sorenson PSU under e-lab shelf | ||||
| install automatic drain on air compressor | ||||
| install filter on large sandblaster | ||||
| separate lights and equipment circuits in metal shop | ||||
| organize above window lumber storage areas | ||||
| add cleanout dates to member storage | ||||
| organize scrap lumber under chop saw | ||||
| dispose of old fluorescent lights | ||||
| pack up chem lab glassware and equipment into boxes | Nick takes home | |||
| set up phone that is in kitchen | ||||
| Chain link fence cage for dust collector | ||||
| add Cowl to furnaces | aim into metal shop, aim at west side of shop. | |||
| Slate counter top in old chemlab | Build mobile counter station | |||
| Finalize hood vent in old chemlab | Finish extending vent to roof. | |||
| Forklift repair | Repair ignition switch |