ToDo
(Difference between revisions)
(minor updates) |
|||
| (18 intermediate revisions by 8 users not shown) | |||
| Line 1: | Line 1: | ||
| − | Welcome to the Potlock to do list, please pick a task and put your name in the column. | + | Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions? contact Dustin White dustinbikes@gmail.com) |
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store. | Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store. | ||
| Line 11: | Line 11: | ||
! Approx Cost of materials | ! Approx Cost of materials | ||
|- | |- | ||
| − | | | + | | Clean and sweep under graveyard area |
| − | | | + | | |
| | | | ||
| − | |||
| − | |||
| − | |||
| − | |||
| | | | ||
| − | |||
|- | |- | ||
| Rearrange phone buttons so they're accurately labeled | | Rearrange phone buttons so they're accurately labeled | ||
| − | | | + | | This is a firmware change, I just need to figure out which one it is. |
| − | | | + | | Nate W |
| $0 | | $0 | ||
|- | |- | ||
| Line 36: | Line 31: | ||
| | | | ||
|- | |- | ||
| − | | | + | |make stencil on lasercutter |
| − | | | + | |sayings "SWEEP If you can't read this" spraypaint on woodshop floor |
| | | | ||
| | | | ||
| Line 47: | Line 42: | ||
|- | |- | ||
|mount dust collector switches | |mount dust collector switches | ||
| − | | | + | | Second switch needs ran next to the chopsaw! |
| − | | | + | | Greg installed magnet on Saw switch may be ok |
| − | | | + | | G donated Magnet |
|- | |- | ||
|sweep and vaccum | |sweep and vaccum | ||
| Line 57: | Line 52: | ||
|- | |- | ||
|get audio system up and running | |get audio system up and running | ||
| − | |run wire from speakers back to backboard | + | |run wire from speakers back to backboard <- Whats this mean, who do I ask? |
| | | | ||
|terminal strips already in e-room bin | |terminal strips already in e-room bin | ||
| Line 71: | Line 66: | ||
| | | | ||
|- | |- | ||
| − | | | + | |organize above window lumber storage areas |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |organize scrap lumber under chop saw |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |Chain link fence cage for dust collector |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | |add | + | |add Cowl to furnaces |
| + | |aim into metal shop, aim at west side of shop. | ||
| | | | ||
| + | | | ||
| + | |- | ||
| + | |Forklift repair | ||
| + | |Repair ignition switch | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |Replace twitterbot camera |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |purge graveyard |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |manage scrap metal near welding |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |cyclone fence around kilm |
| | | | ||
| + | |Terry W | ||
| + | |$150 | ||
| + | |- | ||
| + | |assemble last set of orange shelves | ||
| + | |the ends arnt the same, either welding together or drilling and bolting | ||
| + | |Nate W | ||
| + | | | ||
| + | |- | ||
| + | |find home for injection molders | ||
| + | | ?? - current home u no like? | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |find new home for paint |
| − | | | + | | |
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |cleanup and revamp hardware land |
| − | | | + | | |
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |fix sandblasters |
| − | + | ||
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |build shelf on sw metal shop wall for storage of materials |
| − | | | + | | |
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |rubber shroud for dust collector |
| − | | | + | | |
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |have nick take home lights, juki, and jointer |
| − | + | | | |
| | | | ||
| | | | ||
|- | |- | ||
| + | |go through wood stock and dispose of unusable | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |build a workbench area for laser cutter | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |build 3 lockable money boxes | ||
| + | | one done 2 to go | ||
| + | | Greg Smith | ||
| + | | 12.82 | ||
| + | |- | ||
| + | |build tool holder for vinyl area | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |find a solution to have am aux jack at commons table for audio | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |organize cleaning cabinet | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |setup scanner/copier/blog station | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |return little busted ass laser to AHA | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |build cart for large power supplies | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |clean the hell out of craft room | ||
| + | |Complete inventory of shit, er, supplies; file plan for minor layout changes: Tues. PM (see [[Craft Room Inventory: 20121110]]) | ||
| + | |Kevin Flory | ||
| + | |Under $50 | ||
| + | |- | ||
| + | |move rack into kitchen for extra pop | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |clean kitchen and mop floor | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |buy 3 drawer thingy for kitchen | ||
| + | |buy untensils and bowls for kitchen from dollar tree | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |hang shop light over table saw | ||
| + | |buy shop light for two 4ft T8 bulbs | ||
| + | | | ||
| + | |$20 | ||
| + | |- | ||
| + | |mount pegboard box on NW user storage end cap | ||
| + | |box is clamped in place, needs permanent fastening | ||
| + | | | ||
| + | |$0, supplies on hand | ||
| + | |- | ||
| + | |Build wood shop machine cart | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |Install Casters on Wood Shop router table | ||
| + | |Admire how nice it is | ||
| + | |Greg Smith | ||
| + | | | ||
| + | |- | ||
| + | |Move Drill Press to Wood Shop | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |Make "I don't know where this goes" boxes for each main area | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |Add dust cover to south side of freestanding member storage | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door | ||
| + | | | ||
| + | |Jim Kemp | ||
| + | |$0 | ||
| + | |- | ||
| + | | Bolt the machine shop bench to the North wall | ||
| + | | | ||
| + | | Ted | ||
| + | | $0 | ||
| + | |- | ||
| + | |||
[[Category:Organization Information]][[Category:Reference Data]] | [[Category:Organization Information]][[Category:Reference Data]] | ||
Revision as of 07:44, 27 November 2012
Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions? contact Dustin White dustinbikes@gmail.com)
Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.
| Task | Next Action | Volunteer? | Approx Cost of materials |
|---|---|---|---|
| Clean and sweep under graveyard area | |||
| Rearrange phone buttons so they're accurately labeled | This is a firmware change, I just need to figure out which one it is. | Nate W | $0 |
| Make "how to transfer calls, etc" cheatsheet for each phone | Figure that out! | $0 | |
| make vinyl "propaganda signs" | sayings about keeping the place clean and such | ||
| make stencil on lasercutter | sayings "SWEEP If you can't read this" spraypaint on woodshop floor | ||
| install seals around garage door | |||
| mount dust collector switches | Second switch needs ran next to the chopsaw! | Greg installed magnet on Saw switch may be ok | G donated Magnet |
| sweep and vaccum | |||
| get audio system up and running | run wire from speakers back to backboard <- Whats this mean, who do I ask? | terminal strips already in e-room bin | |
| mount and wire security cameras | |||
| install automatic drain on air compressor | |||
| organize above window lumber storage areas | |||
| organize scrap lumber under chop saw | |||
| Chain link fence cage for dust collector | |||
| add Cowl to furnaces | aim into metal shop, aim at west side of shop. | ||
| Forklift repair | Repair ignition switch | ||
| Replace twitterbot camera | |||
| purge graveyard | |||
| manage scrap metal near welding | |||
| cyclone fence around kilm | Terry W | $150 | |
| assemble last set of orange shelves | the ends arnt the same, either welding together or drilling and bolting | Nate W | |
| find home for injection molders | ?? - current home u no like? | ||
| find new home for paint | |||
| cleanup and revamp hardware land | |||
| fix sandblasters | |||
| build shelf on sw metal shop wall for storage of materials | |||
| rubber shroud for dust collector | |||
| have nick take home lights, juki, and jointer | |||
| go through wood stock and dispose of unusable | |||
| build a workbench area for laser cutter | |||
| build 3 lockable money boxes | one done 2 to go | Greg Smith | 12.82 |
| build tool holder for vinyl area | |||
| find a solution to have am aux jack at commons table for audio | |||
| organize cleaning cabinet | |||
| setup scanner/copier/blog station | |||
| return little busted ass laser to AHA | |||
| build cart for large power supplies | |||
| clean the hell out of craft room | Complete inventory of shit, er, supplies; file plan for minor layout changes: Tues. PM (see Craft Room Inventory: 20121110) | Kevin Flory | Under $50 |
| move rack into kitchen for extra pop | |||
| clean kitchen and mop floor | |||
| buy 3 drawer thingy for kitchen | buy untensils and bowls for kitchen from dollar tree | ||
| hang shop light over table saw | buy shop light for two 4ft T8 bulbs | $20 | |
| mount pegboard box on NW user storage end cap | box is clamped in place, needs permanent fastening | $0, supplies on hand | |
| Build wood shop machine cart | |||
| Install Casters on Wood Shop router table | Admire how nice it is | Greg Smith | |
| Move Drill Press to Wood Shop | |||
| Make "I don't know where this goes" boxes for each main area | |||
| Add dust cover to south side of freestanding member storage | |||
| Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door | Jim Kemp | $0 | |
| Bolt the machine shop bench to the North wall | Ted | $0 |