Difference between revisions of "ToDo"

From i3Detroit
Jump to: navigation, search
(Strikethrough completed items. Awesome potlock!)
(44 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 +
Looking for ways to help around the space? Apply your talents here!
  
 +
If you're not sure about the details of something here, [[Communication|post to the group]] and ask.
  
Welcome to the Potlock to do list, please pick a task and put your name in the column. (any questions?  contact Dustin White dustinbikes@gmail.com)
+
= Periodic tasks =
 
+
{| cellspacing="1" cellpadding="1" border="1"
Need supplies? Toss 'em on the [[ShoppingList]] and maybe somebody will check that page from their phone next time they're at the store.
+
|-
 +
! Task
 +
! notes
 +
! last performed
 +
|-
 +
| Check/update all machine signs
 +
| just print the first section of each machine's wiki page and stick it to the machine
 +
| 2013 november
 +
|-
 +
| check/update all zone warden signs
 +
| just print the first section of each zone's wiki page and post it in the zone
 +
| 2013 december
 +
|-
 +
| purge graveyard
 +
| put today's date on all undated items. Items over 90 days old go to dumpster/recycle.
 +
| 2013 december
 +
|-
 +
| clean and sweep under graveyard
 +
| ideally every time the recycling goes out...
 +
|
 +
|-
 +
| Genie preventive maintenance
 +
| see [[User:nbezanson|NateB]]. Should be done every 6mo or so.
 +
|
 +
|-
 +
| stock paper towel stations
 +
| use the e-room one as an example
 +
| 2013 december
 +
|-
 +
| ..
 +
| ...
 +
| ....
 +
|-
 +
|}
  
 +
= Nonrecurring tasks =
  
 
{| cellspacing="1" cellpadding="1" border="1"
 
{| cellspacing="1" cellpadding="1" border="1"
Line 10: Line 46:
 
! Task  
 
! Task  
 
! Next Action  
 
! Next Action  
! Volunteer?
+
! notes
! Approx Cost of materials
+
 
|-
 
|-
| Clean and sweep under graveyard area
+
| Add lights over welding bench
|
+
| Hang first light near outlet on wall with chain
 +
| extend conduit from switched outlet on wall up n over I-beam trolley for second light. or extend from current switched ceiling lighting for always on when general shop lights are on.
 +
|-
 +
| <s>Remove fittings from pipe/conduit and store in "clean stock" rack</s>
 
|
 
|
|
+
|  
|-
+
| Rearrange phone buttons so they're accurately labeled
+
| This is a firmware change, I just need to figure out which one it is.
+
| Nate W
+
| $0
+
 
|-
 
|-
| Make "how to transfer calls, etc" cheatsheet for each phone
+
| <s>Add blue paint/tape to machine-shop items (letter drills especially)</s>
| Figure that out!
+
 
|  
 
|  
| $0
+
| need blue spraypaint, blue paintstick, blue tape
 
|-
 
|-
|<strike> make vinyl "propaganda signs"</strike>
+
| <s>Make new "i3detroit" and "1481A" vinyl for front door window</s>
|<strike> sayings about keeping the place clean and such</strike>
+
 
|
 
|
 
|
 
|
 
|-
 
|-
|<strike> make stencil on lasercutter</strike>
+
| Clean the trap under the urinal, which is draining slowly
|<strike> sayings "SWEEP If you can't read this" spraypaint on woodshop floor</strike>
+
 
|
 
|
 +
| (and make a "NO MOP BUCKET DUMPING HERE" sign for it? Sigh.
 +
|-
 +
| <s>Reprint all the fastener-basics pages over by the fasteners stock</s>
 
|
 
|
 +
| And put 'em in sheet-protectors this time.
 
|-
 
|-
|install seals around garage door
+
| <s>Separate the compute-zone circuit from the treehouse wiring</s>
 
|
 
|
 +
| See Nate B for outlet details
 +
|-
 +
| <s>Take down useless air plumbing near metal shop north wall</s>
 
|
 
|
 +
| and rehang the Dake sign somewhere
 +
|-
 +
| <s>rehang the Red Green autographed 'duct tape' roll</s>
 
|
 
|
 +
| near his head perhaps?
 
|-
 
|-
|mount dust collector switches
+
| <s>Build new shelving for blue-bins</s>
| Second switch needs ran next to the chopsaw!
+
| design!
| Greg installed magnet on Saw switch may be ok
+
| approximately replace the gray metal van-shelf
| G donated Magnet
+
 
|-
 
|-
|sweep and vaccum
+
| Build riser for low workbench in tool crib
|
+
|Everyone - Everyday!
+
 
|
 
|
 +
| see Brian W for design?
 
|-
 
|-
|get audio system up and running
+
| Hang more lights in metal shop
|run wire from speakers back to backboard <- Whats this mean, who do I ask?
+
 
|
 
|
|terminal strips already in e-room bin
+
| see Steve B for placement?
 
|-
 
|-
|mount and wire security cameras
+
| <s>Rehang e-room east bench on longer Unistrut for shelf support</s>
|
+
|
+
 
|
 
|
 +
| need 4 pieces of strut, each 4-5' long
 
|-
 
|-
|install automatic drain on air compressor
+
| <s>Remove/rehang orange air hose feeding bike zone</s>
|
+
|
+
 
|
 
|
 +
| so it's not wrapped around everything
 
|-
 
|-
|organize above window lumber storage areas
+
| <s>Fix air leaks!</s>
|
+
 
|
 
|
 
|
 
|
 
|-
 
|-
|organize scrap lumber under chop saw
+
| <s>Cut and hang small whiteboard inside fablab north door</s>
 
|
 
|
 
|
 
|
 +
|-
 +
| Winterize roof vents
 
|
 
|
 +
| need a piece of the pink foam insulation
 
|-
 
|-
|Chain link fence cage for dust collector
+
| Update our photos on hackerspaces.org
|
+
 
|
 
|
 
|
 
|
 
|-
 
|-
|add Cowl to furnaces
+
| label/number each plot in member storage
|aim into metal shop, aim at west side of shop.
+
| vinyl all the things!
|
+
|  
|
+
 
|-
 
|-
|<strike>Forklift repair</strike>
+
| merge [[Map_of_Zones]] into [[Zones]] and make the former a redirect
|<strike>Repair ignition switch</strike>
+
 
|
 
|
 
|
 
|
 
|-
 
|-
|Replace twitterbot camera
+
| Tint [[http://i3detroit.org/wi/index.php?title=File:92913Detail_layout.pdf]] according to zone tape colors and replace graphic on [[Zones]]
|
+
|
+
 
|
 
|
 +
|
 
|-
 
|-
|<strike>purge graveyard</strike>
+
| hardwired outlet on column near TV
|
+
| consult Dave S on circuit to pull from
|
+
 
|
 
|
 
|-
 
|-
|manage scrap metal near welding
+
| Guest-sign-in poster near door
|
+
| design (flowchart?)
 +
| How to waiver, meet host, sign log, etc
 +
|-
 +
| Make contact with local ACM and IEEE chapters
 
|
 
|
 
|
 
|
 
|-
 
|-
|<strike>cyclone fence around kiln</strike>
+
| restock powerpole parts
|
+
| inventory what we have
|Terry W
+
| ([[User:nbezanson|NateB]] task.) Also print labels for the new baggies cuz sharpie rubs off the bags
|$150
+
 
|-
 
|-
|<strike>assemble last set of orange shelves</strike>
+
| change hydraulic fluid in Genie
|<strike>the ends arnt the same, either welding together or drilling and bolting</strike>
+
| obtain new fluid (cheap Dexron is fine)
|Nate W
+
| Would be nice to find that filter and change it at the same time...
|
+
 
|-
 
|-
|<strike>find home for injection molders</strike>
+
| lubricate Genie column
| ?? - current home u no like?
+
| buy some Boe-Lube spray
|
+
| because the stick stuff is awkward
|
+
 
|-
 
|-
|<strike>find new home for paint</strike>
+
| install remaining cameras to DVR
|
+
| ?
|
+
 
|
 
|
 
|-
 
|-
|cleanup and revamp hardware land
+
| Make "how to phone" cheatsheets for phones
|
+
| ?
|
+
| how to transfer calls, how to intercom, how to dial out...
|
+
 
|-
 
|-
|fix sandblasters
+
| finish installing carpet squares in electronics room
|
+
| do we have adhesive?
|
+
| trim and stuff all the edge pieces
|
+
 
|-
 
|-
|build shelf on sw metal shop wall for storage of materials
+
| add motion sensors to lights under treehouse
|
+
| identify and obtain appropriate sensors
|
+
| surplus wattstoppers?
|
+
 
|-
 
|-
|<strike>rubber shroud for dust collector</strike>
+
| <s>hang new banner over garage door</s>
|
+
|
+
 
|
 
|
 +
| cuz the one out there is kinda worn! maybe relocate it indoors somewhere?
 +
|-
 +
| update photos on hackerspaces.org
 +
| take new photos after a cleaning spree :)
 +
| updating the rest of the blurb there would be good too
 
|-
 
|-
|have nick take home lights, juki, and jointer
+
| make wire spool dispenser for 22AWG solid "breadboard wire"
|Juki and lights have left, Jointer?
+
|
+
 
|
 
|
 +
| like [http://www.adafruit.com/products/1311] to hang under the shelf above the bench
 
|-
 
|-
|go through wood stock and dispose of unusable
+
| place phone by laser cutter
|
+
|
+
 
|
 
|
 +
| so the operator can take and receive spacephone calls without walking away from a job in progress
 
|-
 
|-
|<strike>build a workbench area for laser cutter</strike>
+
| fix voicemail notification threshhold
|
+
|
+
 
|
 
|
 +
| so it only tells us about messages >5 seconds or something
 
|-
 
|-
|build 3 lockable money boxes
+
| rewrite IVR script for spacephone
| one done 2 to go
+
| learn asterisk...
| Greg Smith
+
| see NateW for access
| 12.82
+
 
|-
 
|-
|build tool holder for vinyl area
+
| Fix Chronotune startup bug, tuning scaling math
|This would be nice to vacuum form!
+
|  
|
+
| see Ted or Eric for a primer on the code
|
+
 
|-
 
|-
|find a solution to have am aux jack at commons table for audio
+
| Build a smallish (collapsible?) spray booth
|
+
|
+
 
|
 
|
 +
| with some sort of outside exhaust connection, please
 
|-
 
|-
|<strike>organize cleaning cabinet</strike>
+
| <s>Paint 36-inch keepout zones around electrical panels</s>
|
+
|
+
 
|
 
|
 +
| see http://www.jlconline.com/panels/q-a--electrical-panel-location-in-kitchen.aspx for info
 
|-
 
|-
|setup scanner/copier/blog station
+
| Build a printer that, when presented with a member's RFID tag, prints a label with their name, phone, email, date
|
+
|
+
 
|
 
|
 +
| print onto masking tape or Avery 4013's because they're sooo cheap
 
|-
 
|-
|return little busted ass laser to AHA
+
| Put a bill acceptor into the vending machine
|
+
|  
|
+
| the one sitting atop the machine needs repair
|
+
 
|-
 
|-
|build cart for large power supplies
+
| replace diagonal runs of cat-5 that make the ceiling look nasty
|
+
|  
|
+
| every electrical inspector hates that
|
+
 
|-
 
|-
|clean the hell out of craft room
+
| invent a paperless way for people to fill out waivers
|Complete inventory of shit, er, supplies; file plan for minor layout changes: Tues. PM (see [[Craft Room Inventory: 20121110]])
+
| research legal signature-capture? Do we keep the paper ones in some reliable manner?  Does this need fixing first?
|Kevin Flory
+
| bonus points if they can swipe some existing ID and prefill some fields. double-bonus if it records their hosting member by RFID.
|Under $50
+
 
|-
 
|-
|<strike>move rack into kitchen for extra pop</strike>
+
| finish the Open Access Control system
|
+
| coordinate with Evan
|
+
| mostly the CRM tie-in needs to be done, I think
|
+
 
|-
 
|-
|clean kitchen and mop office floors
+
| Implement Bluecam
|Wax floors later in the night after everyone is done up front
+
| talk to Jon for his progress?
|
+
| See NateB for concept
|
+
 
|-
 
|-
|<strike>buy 3 drawer thingy for kitchen</strike>
+
| Replace cat-5 to accesspoint above rack
|buy utensils and bowls for kitchen from dollar tree
+
|  
|
+
| so it doesn't fly through the air quite so uglyly
|
+
 
|-
 
|-
|<strike>hang shop light over table saw</strike>
+
| Expand cable-path down backboard
|<strike>buy shop light for two 4ft T8 bulbs </strike>
+
|  
|
+
| add larger D-rings or more bridle rings
|$20
+
 
|-
 
|-
|mount pegboard box on NW user storage end cap
+
| <s>Establish a place for ladders to live</s>
|box is clamped in place, needs permanent fastening
+
|  
|
+
|  
|$0, supplies on hand
+
 
|-
 
|-
|Build wood shop machine cart
+
| Find a way for the CRM to add/remove people to/from the Groups
|
+
|  
|
+
 
|
 
|
 
|-
 
|-
|Install Casters on Wood Shop router table
+
| Build 4 tables for the Craft Room.
|Admire how nice it is
+
|Greg Smith
+
 
|
 
|
 +
| Rough benches like the thumbnail[[File:CraftRoomTable.jpg|20px|thumb]]; desired tabletop size is 30" x 36', height 32".  For extra points, add height adjustment screws like those on the existing craft room tables!  See Kevin or Justin for more details.
 
|-
 
|-
|<strike>Move Drill Press to Wood Shop</strike>
+
| Tape Outlines of Zones on the Floor
|Find better location in Wood Shop, NOT in front of sweep drop to dust collector.
+
|  
|
+
|  
|
+
 
|-
 
|-
|<strike>Make "I don't know where this goes" boxes for each main area</strike>
+
| <s>get Inkcut running on the vinyl laptop</s>
|
+
|  
|
+
|  
|
+
 
|-
 
|-
|Add dust cover to south side of freestanding member storage
+
| <s>add 7-segment displays to opto section</s>
|
+
| move some sensors inventory into new cabinet
|
+
| ([[User:nbezanson|NateB]] task.)
|
+
 
|-
 
|-
|<strike>Move SandBlast Station and supplies to East Wall between Welding Zone and Overhead Door</strike>
+
| <s>Set up a public terminal or two, for printing and signup tasks, etc</s>
|
+
|  
|Jim Kemp
+
| with clear contact info for who maintains them, please :)
|$0
+
 
|-
 
|-
| <strike>Bolt the machine shop bench to the North wall </strike>
+
| <s>Replace battery in west-wall emergency light</s>
 +
| identify size/voltage and edit this entry
 
|
 
|
| Ted
 
| $0
 
 
|-
 
|-
| <strike>Audit Door Access keys</strike>
+
| <s>add outlet for lights near welding area</s>
|
+
|  
| Nate W
+
| so they don't need an extension cord...
| $0
+
 
|-
 
|-
  
[[Category:Organization Information]][[Category:Reference Data]]
+
|}

Revision as of 22:54, 8 December 2013

Looking for ways to help around the space? Apply your talents here!

If you're not sure about the details of something here, post to the group and ask.

Periodic tasks

Task notes last performed
Check/update all machine signs just print the first section of each machine's wiki page and stick it to the machine 2013 november
check/update all zone warden signs just print the first section of each zone's wiki page and post it in the zone 2013 december
purge graveyard put today's date on all undated items. Items over 90 days old go to dumpster/recycle. 2013 december
clean and sweep under graveyard ideally every time the recycling goes out...
Genie preventive maintenance see NateB. Should be done every 6mo or so.
stock paper towel stations use the e-room one as an example 2013 december
.. ... ....

Nonrecurring tasks

Task Next Action notes
Add lights over welding bench Hang first light near outlet on wall with chain extend conduit from switched outlet on wall up n over I-beam trolley for second light. or extend from current switched ceiling lighting for always on when general shop lights are on.
Remove fittings from pipe/conduit and store in "clean stock" rack
Add blue paint/tape to machine-shop items (letter drills especially) need blue spraypaint, blue paintstick, blue tape
Make new "i3detroit" and "1481A" vinyl for front door window
Clean the trap under the urinal, which is draining slowly (and make a "NO MOP BUCKET DUMPING HERE" sign for it? Sigh.
Reprint all the fastener-basics pages over by the fasteners stock And put 'em in sheet-protectors this time.
Separate the compute-zone circuit from the treehouse wiring See Nate B for outlet details
Take down useless air plumbing near metal shop north wall and rehang the Dake sign somewhere
rehang the Red Green autographed 'duct tape' roll near his head perhaps?
Build new shelving for blue-bins design! approximately replace the gray metal van-shelf
Build riser for low workbench in tool crib see Brian W for design?
Hang more lights in metal shop see Steve B for placement?
Rehang e-room east bench on longer Unistrut for shelf support need 4 pieces of strut, each 4-5' long
Remove/rehang orange air hose feeding bike zone so it's not wrapped around everything
Fix air leaks!
Cut and hang small whiteboard inside fablab north door
Winterize roof vents need a piece of the pink foam insulation
Update our photos on hackerspaces.org
label/number each plot in member storage vinyl all the things!
merge Map_of_Zones into Zones and make the former a redirect
Tint [[1]] according to zone tape colors and replace graphic on Zones
hardwired outlet on column near TV consult Dave S on circuit to pull from
Guest-sign-in poster near door design (flowchart?) How to waiver, meet host, sign log, etc
Make contact with local ACM and IEEE chapters
restock powerpole parts inventory what we have (NateB task.) Also print labels for the new baggies cuz sharpie rubs off the bags
change hydraulic fluid in Genie obtain new fluid (cheap Dexron is fine) Would be nice to find that filter and change it at the same time...
lubricate Genie column buy some Boe-Lube spray because the stick stuff is awkward
install remaining cameras to DVR  ?
Make "how to phone" cheatsheets for phones  ? how to transfer calls, how to intercom, how to dial out...
finish installing carpet squares in electronics room do we have adhesive? trim and stuff all the edge pieces
add motion sensors to lights under treehouse identify and obtain appropriate sensors surplus wattstoppers?
hang new banner over garage door cuz the one out there is kinda worn! maybe relocate it indoors somewhere?
update photos on hackerspaces.org take new photos after a cleaning spree :) updating the rest of the blurb there would be good too
make wire spool dispenser for 22AWG solid "breadboard wire" like [2] to hang under the shelf above the bench
place phone by laser cutter so the operator can take and receive spacephone calls without walking away from a job in progress
fix voicemail notification threshhold so it only tells us about messages >5 seconds or something
rewrite IVR script for spacephone learn asterisk... see NateW for access
Fix Chronotune startup bug, tuning scaling math see Ted or Eric for a primer on the code
Build a smallish (collapsible?) spray booth with some sort of outside exhaust connection, please
Paint 36-inch keepout zones around electrical panels see http://www.jlconline.com/panels/q-a--electrical-panel-location-in-kitchen.aspx for info
Build a printer that, when presented with a member's RFID tag, prints a label with their name, phone, email, date print onto masking tape or Avery 4013's because they're sooo cheap
Put a bill acceptor into the vending machine the one sitting atop the machine needs repair
replace diagonal runs of cat-5 that make the ceiling look nasty every electrical inspector hates that
invent a paperless way for people to fill out waivers research legal signature-capture? Do we keep the paper ones in some reliable manner? Does this need fixing first? bonus points if they can swipe some existing ID and prefill some fields. double-bonus if it records their hosting member by RFID.
finish the Open Access Control system coordinate with Evan mostly the CRM tie-in needs to be done, I think
Implement Bluecam talk to Jon for his progress? See NateB for concept
Replace cat-5 to accesspoint above rack so it doesn't fly through the air quite so uglyly
Expand cable-path down backboard add larger D-rings or more bridle rings
Establish a place for ladders to live
Find a way for the CRM to add/remove people to/from the Groups
Build 4 tables for the Craft Room. Rough benches like the thumbnail
CraftRoomTable.jpg
; desired tabletop size is 30" x 36', height 32". For extra points, add height adjustment screws like those on the existing craft room tables! See Kevin or Justin for more details.
Tape Outlines of Zones on the Floor
get Inkcut running on the vinyl laptop
add 7-segment displays to opto section move some sensors inventory into new cabinet (NateB task.)
Set up a public terminal or two, for printing and signup tasks, etc with clear contact info for who maintains them, please :)
Replace battery in west-wall emergency light identify size/voltage and edit this entry
add outlet for lights near welding area so they don't need an extension cord...