ToDo
From i3Detroit
Bored? Got an urge to do stuff for the space? Pick a task from this list, and advance it. Ask for help if you need it.
Need supplies? Toss 'em on the [ShoppingList] and maybe somebody will check that page from their phone next time they're at the store.
| Task | Next Action | Volunteer? | Approx Cost of materials |
|---|---|---|---|
| Fix OFF switch on Grizzly (wood) band saw. | |
||
| |
|
Nate W | $22 |
| |
10+ pack, We use T-8 4100k Could always use more. | Nate W | $20-25 |
| Move new-ish light over the utilitub to the emergency lighting circuit to illuminate light switches and breaker panels in the dark shop | Emergency circuit is apparently in the same conduit as the circuit that powers the light now | ||
| Move tool crib drop cord reel from light-switch circuit to another circuit | ask Dave S about an (apparently) unused circuit in the SE shop ceiling conduits | ||
| Replace ceiling fan by parts area, rehang commons fan, de-kludge fan wiring | note: new fan is on kiln table, labeled "FAN" | Dave S | |
| Uninstall old ass furnace in large door bay. | Unit is inefficient, and useless! | Genie + Forklift | $0 ? |
| Move light switches near door | Install switches by main entrance to control all overhead lights. - Leave machine shop separate, reroute switch within machine shop. |
?? | |
| |
|
You are my hero! | |
| Vinyl propaganda signs | Come up with sayings "Sweep around machines, do I look like your mom?" | Nate W/Vinyl Team | $0 |
| Redo drip pan above server rack before it turns into a waterfall. | Install drain tube down to washtub | $10-20? | |
| Install shelving in Power wheels area, re-purpose benches. | Find more 12-14' pallet racking | nate w / rocco / anyone! | ??? |
| Garage-door floor | Raise concrete level below door higher than outside. Home depot has thick rubber seals that would help too. $10ish |
Nate W | $4-14 |
| Redo shop restroom | Remount & Paint stalls, Title floor, Cover walls. | $$$? - a lot | |
| seal off end of member storage shelves in woodshop so that equipment can be butted against it. | Screw panels to ends of shelves, and between to create full wall. | $48 | |
| Mount and wire motor to dust collector | Ted and Nate B are looking into this. |
||
| Mount dust collector relays | 1 on dust collector, 2nd near table saw. | ||
| PRIOR TASKS THAT STILL NEED DONE!! | |||
| Update MSDS binder by door | |||
| |
Get high off 3m adhesive primer | Anyone? See Nate B | $0 |
| Construct shop-vac accessories rack | Gather all nozzles and design rack | ||
| Clear Genie-width path to member storage | $0 | ||
| remove MDF table/counters from wood shop | ask Nick to take home/remove | $0 | |
| Mount monitor on/near rack, for admin KVM usage | $0 | ||
| Consolidate adhesives/solvents/cleaners/etc and label each location with pointers to the other |
|||
| Cover roof openings, consider snow-melt drainage in your design | Adjust rear shop cover, cover is not air tight and has shifted with a draft. | $0 | |
| Winterization stuff (Bill putt suggested -- need more specifics) | $0 | ||
| add dividers to member storage shelves | use tape or paint to divide the shelves into quarters | ||
| clean up FIRST area | throw away junk and put all gear into bins below benches | $0 | |
| sweep and vacuum your butt off | everyone! | $0 | |
| identify emergency exit routes and paint the lines | we have floor marking paint, (update:picked up skinny rollers) | $0 | |
| finish up audio system | mount amplifiers in rack, mount speakers, run wire | $0 | |
| mount and wire security cameras | talk to Joe B or Nate B about camera mount locations | ? | |
| Make boxes to store assorted tools in tool area | identify tools which need boxes | $0 | |
| remove desk from whiteboard room | $0 | ||
| organize fastener area | organize and label fasteners | $0 | |
| build table for little sanblaster | talk to dustin about getting the sandblaster set up | $9 | |
| Reroute all e-room bench equipment power cords to go behind shelf (empty shelf, rip half an inch off its depth, remount it, reload it) |
$0 | ||
| Label all E-room gear power cords (Many already done, follow example) | $0 | ||
| Document 115V circuits | Documentation: Breaker Panels | Dave S | |
| allocate two of the steel drums for aluminum and steel scrap | put vinyl signage on drums | $0 | |
| store unused dust collector manifold and filters in loft | put filters in garbage bags | $0 | |
| move 5sl printer away from print shop over to server area. | $0 | ||
| organize vinyl cutter area. | |||
| level rough concrete | $8 | ||
| make signage to identify circuit breakers | $0 | ||
| make a cart for folding chairs | ??? | ||
| replace vents in office area | ??? | ||
| cut vent in electronics room and install vent cover | there is a vent in wall that has been drywalled over | ??? | |
| install cisco network gear into rack | rocco will be bringing in a rack for this purpose | rocco | $0 |
| clean up kitchen and throw out old stock of goods | $0 | ||
| install small shelf to place microwave in cabinet | talk to dustin for direction | $0 | |
| talk to Bob B about painting fridge (brown one) | $0 | ||
| make soda can dispensers for white refrigerator | talk to dustin for direction | ??? | |
| pull down drum from metal dust collector in metal shop | assess if machine is in functioning order | ||
| Mount Sorensen PSU under e-lab shelf | Nate or Joe |