ToDo
From i3Detroit
Welcome to the Potlock to do list, please pick a task and put your name in the column.
Need supplies? Toss 'em on the ShoppingList and maybe somebody will check that page from their phone next time they're at the store.
| Task | Next Action | Volunteer? | Approx Cost of materials |
|---|---|---|---|
| Add new magnetic switch to grizzly bandsaw | Nick B? | ||
| Move tool crib cord reel to own circuit | Dave S? | ||
| remove old as furnace by front door | |||
| Move switches for all commons lights near front door | |||
| make vinyl "propaganda signs" | sayings about keeping the place clean and such | ||
| Redo drip pan above server rack, and install tube to sink for drainage | |||
| Put up more shelving in power wheels area | |||
| intall seals around garage door | |||
| Seal off end of member storage to help deflect dust | |||
| mount second motor onto dust collector and wire it up | |||
| mount dust collector switches | |||
| make storage area for shop vac accessories | |||
| sweep and vaccum | |||
| get audio system up and running | |||
| mount and wire security cameras | |||
| clean up and organize fastener area | |||
| build a bench for the two sandblaster to live on | |||
| make a cart to hold the folding chairs | |||
| pull down old dust collector in metal shop and assess | |||
| mount sorenson PSU under e-lab shelf | |||
| make a bin for cargo straps and bungees | |||
| install automatic drain on air compressor | |||
| move the milo speakers to the loft | |||
| build another clamp rack identical to first one | |||
| organize forms area by front door, run off plenty of copies | |||
| install filter on large sandblaster | |||
| make sure all fire extinguishers are properly hung | |||
| separate lights and equipment circuits in metal shop | |||
| add floor sweep to dust collector | |||
| organize above window lumber storage areas | |||
| dispose of big red dust collector pipe | |||
| add cleanout dates to member storage | |||
| add longer cord to jointer | |||
| organize scrap lumber under chop saw | |||
| build rack for small lumber storage | |||
| re-wire treehouse lights to one switch | |||
| dispose of old fluorescent lights | |||
| Buy/install new fluorescent light fixtures | |||
| hang i3 sign at front door, peel off ebay part from back | |||
| pack up chem lab glassware and equipment into boxes | Nick takes home | ||
| clear out hallway in office | fire marshall does not like | ||
| finish carpet tiles in e room | |||
| set up phone that is in kitchen | |||
| break down and dispose of black table near graveyard | |||
| have Russ take home hitachi tablesaw | |||
| organize black metro rack by door | |||
| hang up giant picture of war machine from iron man | |||
| either re-hang or dispose of conduit chandelier | |||
| install pullchain on light fixture above welding area | |||
| install second 220 plug on other side of box for kiln | |||
| get rid of parabolic dish | |||
| break down half moon desk and send it to dumpster town. | |||
| add second cord reel above commons tables | |||
| Chain link fence cage for dust collector | |||
| add Cowl to furnaces | aim into metal shop, aim at west side of shop. | ||
| Slate counter top in old chemlab | Build mobile counter station | ||
| Finalize hood vent in old chemlab |